National Chi Nan University - Campus Renewable Energy Production Report

University: National Chi Nan University (NCNU)

Country: Republic of China (Taiwan, R.O.C.)

Web Address: https://www.ncnu.edu.tw/

Renewable Energy Facilities and Installed Capacity

No. Product / Equipment Installed Capacity (kWp / kW) Location
1 Solar PV System 4,129.39 Building Roofs
2 Wind Power Equipment 20.00 Science & Technology Building I
3 Micro-hydroelectric Power System 10.00 Sports and Health Center
4 Elevator Regenerative System 30.00 Multi-Purpose Classrooms Building B

Project Description and Progress

To reduce energy use, NCNU has actively increased the use of renewable energy on campus. On August 20, 2020, the university signed a contract with the Nantou County Government for the "Green Roof National Participation Project" and constructed 4,129.39 kWp of solar power generation equipment on campus in 2022. In 2025, the solar power generation capacity reached 16,709.20 GJ (4,641,444 kWh), accounting for approximately 38.4% of the university's annual electricity consumption.

By 2026, the university will install an additional 4,353 kW of solar photovoltaic (PV) equipment over the outdoor courts. This will bring the total campus solar PV capacity to 8,482 kW, with an estimated annual generation of 37,894.18 GJ (10,526,162 kWh), covering about 90% of the university's overall electricity demand.

The electricity generated from renewable energy is supplied directly to campus buildings, effectively reducing dependence on the public power grid. Through these initiatives, NCNU serves as a role model for environmental protection and welcomes community visits to observe the renewable energy systems and promote sustainability education.

Annual Electricity Consumption and Renewable Energy Generation (Unit: GJ)

* Conversion Factor: 1 kWh = 0.0036 GJ

Year Total Electricity Consumption (GJ) Total Power Generation (GJ) Generation / Consumption Ratio
2020 41,336.64 915.36 2.21%
2021 39,132.25 14,087.13 35.90%
2022 42,196.54 14,591.18 34.57%
2023 41,132.75 14,199.70 34.52%
2024 43,664.18 14,738.86 33.70%
2025 43,422.91 16,709.20 38.40%

On-Site Facilities and Implementation Overview